Current Task List
- Finish removal of electrical cabinet on lower building backside (Squirrl)
- Repair air compressor hose to mat cutter connection
- Create service area around picture framing equipment and material
- Make space for the equipment in Berryville that's slated to arrive in Purcellville around 10/16
-
Wish list (these are all pending budget approval, so this is truly a wish list at this time.
- I wish for some people to add their wishes for Purcellville here
- Get blacksmithing up and running (doesn't require power)
- Power to the mat cutter bay for testing (for picture framing)
- Mobile (standing height) work table for framing area