  • We need an electrician to come through to look at outlets that are not working, plus add on plugs for the Roland UV Printer, multiple tools in the Metal Shop plus possibly more in the cosplay area. 
  • The Woodshop bathroom is wasted space and needs to be finished
  • Drop ceilings need to be replaced in the main room, that way if we have any new leaks, we will know and not confuse the old leaks for new leaks. Plus, it will look nicer.
  • Finish painting the hallway on the right side.
  • The light bulbs need to be disposed of
  • AC Ductwork needs to be added to two vents in the main room in Leesburg, otherwise we are just continuing to cool/heat the ceiling area above the drop ceiling.
  • The area between the woodshop and member storage needs to be cleaned out and organized
  • The woodturning room needs to be worked on/completed
  • We need to schedule a monthly workday.  Saturday, JUly 14th has been suggested and will most likely be the day.
  • Run Ethernet Cables since we are having issues with machines, specifically BIG Red, connecting
  • Clean out the metal cabinets in the main room. The beige one on wheels is staying and will be painted to match the Arts & Crafts Area.
  • Main Entry Room needs some love. Maggie Toth has offered her help.



Notes: