...
- Finish removal of electrical cabinet on lower buildingbackside(Squirrl)
- Repair air compressor hose to mat cutter connection
- Create service area around picture framing equipment and material
- Make space for the equipment in Berryville that's slated to arrive in Purcellville around 10/16
- demo old studs in North wall
- reframe north wall with 2x6’s
- strip off old metal siding
- install new sheathing and Tyvek house wrap
- re-frame Bathroom
- re-frame West wall of multipurpose room
- remove East wall (front wall of building)
- frame new East wall with new windows and new door
- run 2x4’s on bottom of roof trusses to support new drywall ceiling
- move Electrical panel to new location,
- install new electrical boxes for lights, switches, and receptacles
- run wiring
- install drywall on ceiling
- to move woodworking tools into position in woodworking room
- make three workbenches for woodworking room
- install insulation in walls and ceiling
- hang drywall.
- finish drywall
- Paint new drywall
- Make workbench for Frame shop to include storage for sheets of glass
-
Replicate threaded leg for frame cutter extender
-
...