...
|
|
|
|
|
|
Total Machine Time:___________________________________________
Folders Created:______________________________________________
Do you need to keep the folders Y/N
Date Folders Can be removed: (No more then 30 days)______________
Machine Setup
- Check Check coolant level on the back of the machine. If coolant is needed mix 4010 coolant stored in the bottom cabinet 4 cups water to 1/2 cup coolant.
- Turn on Air compressor. Red power knob on the side of the air compressor
- Pull the oil choke out. Note this in the log book. This really only needs to be done every 8 hrs, so check the log book first
- Power on machine. Power knob is on the right had side of the machine. Reach from the front of the machine
- Once path pilot is upback
- Un estop the machine
- Push green reset button on pendant
- Select reset in path pilot
- Ensure vise handle it in center hole
- Select RefX, RefY, RefZ
You are now ready to either run a conversational program or execute a gcode program created using fusion or other CAM program
Machine Usage
- Setup Stock
- If using the vise
- Make sure that the stock is held securely and is set square to either a parallel bar or the bottom of the vise
- Make sure you CAM accounts for all fixtures and will not cut into the vise or vise jaws
- If using other fixture
- Use a substrate under your material to ensure you do not cut into the table. A new replacement table is expensive and if damaged is the responsibility of the user to replace.
- If using the vise
...
- Insert Hamier probe into collet
- Move probe to Z0 as trained. Make sure to move in slow movements to ensure you dont break the tip. A broken tip is a $45 charge
- Set Z0
- Repeat for Y axis. Remember to always have Y0 be the back jaw of the vise unless there is a reason to set Y in another location
- Repeat for X axis.
...
Machine Shutdown