Current Task List
- Finish removal of electrical cabinet on lower buildingbackside(Squirrl)
- Repair air compressor hose to mat cutter connection
- Create service area around picture framing equipment and material
- Make space for the equipment in Berryville that's slated to arrive in Purcellville around 10/16
- demo old studs in North wall
- reframe north wall with 2x6’s
- strip off old metal siding
- install new sheathing and Tyvek house wrap
- re-frame Bathroom
- re-frame West wall of multipurpose room
- remove East wall (front wall of building)
- frame new East wall with new windows and new door
- run 2x4’s on bottom of roof trusses to support new drywall ceiling
- move Electrical panel to new location,
- install new electrical boxes for lights, switches, and receptacles
- run wiring
- install drywall on ceiling
- to move woodworking tools into position in woodworking room
- make three workbenches for woodworking room
- install insulation in walls and ceiling
- hang drywall.
- finish drywall
- Paint new drywall
- Make workbench for Frame shop to include storage for sheets of glass
Replicate threaded leg for frame cutter extender
Wish list (these are all pending budget approval, so this is truly a wish list at this time.
- I wish for some people to add their wishes for Purcellville here
- Get blacksmithing up and running (doesn't require power)
- Power to the mat cutter bay for testing (for picture framing)
- Mobile (standing height) work table for framing area