Room Switch-A-Roo Specific List:

  • Help go through the boxes of supplies from the old classroom in the main room and find proper homes for them
  • Remove anything from electronics that doesn't belong in electronics! Find the proper home for each item, do not just stick it somewhere else.
  • Start Prepping the NEW Classroom

    • Wipe down the walls

    • Remove anything that doesn't belong to kid wind, the classroom, scouting or cosplay.
      • equipment boxes can be broken down
      • wood veneer shelves brought upstairs to member storage TEMPORARILY
      • what is in the grey bins?
      • ask Jennifer to find a new home for the wood folding shelf and blue metal chairs
      • folding chairs are staying in the basement 
    • pack up the resin printer supplies NICELY

    • build black metal shelf and place in between two silver shelves (because of the bulkhead)
    • hang 55" tv in the middle of the back wall

      • supplies for possibly mounting to concrete will be available

        •  



Room Specific Lists:

  • NEW 3D Printing
    • Finish laying rubber tiles in the new 3D printing room

    • wet Swiffer the rubber tiles

  • NEW Cosplay:

  • NEW Electronics:

    • Paint walls

      • paint and supplies can be found at the top of the basement stairs or in the room if someone already finished that task.

  • NEW Printmaking:

  • Sewing & Craft Area:

  • Main Room:

    • sweep and vacuum

    • Swiffer deep inside of laser
    • move the long table in the main room back to where it was and fix the supports on it
    • dust and wipe down all glass surfaces

      • this includes computer screens and the top of the laser cutter and UV printer

  • Metal Shop

    • patch the large hole in the wall behind the jewelry bench (supplies labeled and on tall table in main room)

    • wipe down the jewelry bench and surrounding areas of red powder coating powder
    • empty trash
  • Woodshop
    • vacuum floor and around machines

    • empty the trash cans

  • Woodturning

    • vacuum floor and around machines

  • Bathrooms

    • wipe down the sinks

    • dust bathroom vents
    • wipe down the toilets

    • Swiffer the floors

    • empty the trashcans

Building Specific List:

  • Wipe down all windows
  • in the room between wood lathe and woodshop, move shelving so it is flush with left wall, remove flammable box and everything on top of it (to where? help us decide)

  • tape off area around breaker outside woodshop ( 15" horizontally from center of box on each side, and 36" from front of box, 6'6" tall)

    • Please use yellow and black hazard tape that can be found on tall table in main room
  • repair the step at the back door
    • do we have supplies on hand?
    • paint steps red
  • install molding at bottom of stairs
    •  (it should be somewhere shoved in the corner of cosplay)
  • mount Mike Werling's American flag above the finishing room door.
    • please secure it well.
  • sweep and swiffer stairs
  • adhere rubber tiles to top and bottom of stairs
    • adhesive and tiles can be found on tall table in main room
  • empty all shopvacs (CNC, woodshop, laser)
  • wash the trash can lids
    • slop sink would work best & rags are in the supply closet
  • drain all the compressors in the building (laser, woodshop, metal shop)
  • Carry down the 5-gallon kilz paint bucket from top of stairs
  • vacuum all carpeted areas
  • carry short stools to new classroom in basement, only the short ones!
  • move ceramics stuff to Purcellville ceramics room!!



If there is something you'd like to add to this list, please let Jessee M know on slack!