Room Switch-A-Roo Specific List:
- Help go through the boxes of supplies from the old classroom in the main room and find proper homes for them
- Remove anything from electronics that doesn't belong in electronics! Find the proper home for each item, do not just stick it somewhere else.
Room Specific Lists:
- 3D Printing
Finish laying rubber tiles in the new 3D printing room
wet Swiffer the rubber tiles
Cosplay:
Electronics:
Paint walls
paint and supplies can be found at the top of the basement stairs or in the room if someone did the task from above.
Printmaking:
Sewing & Craft Area:
Main Room:
sweep and vacuum
- Swiffer deep inside of laser
- move the long table in the main room back to where it was and fix the supports on it
dust and wipe down all glass surfaces
this includes computer screens and the top of the laser cutter and UV printer
New Classroom
Wipe down the walls
pack up the resin printer supplies
Metal Shop
patch the large hole in the wall behind the jewelry bench
wipe down the jewelry bench and surrounding areas of red powder coating powder
Woodshop
vacuum floor and around machines
empty the trash cans
Woodturning
vacuum floor and around machines
Bathrooms
wipe down the sinks
- dust bathroom vents
wipe down the toilets
Swiffer the floors
empty the trashcans
Building Specific List:
- Wipe down windows
in the room between wood lathe and woodshop, move shelving so it is flush with left wall, remove flammable box and everything on top of it (to where?)
tape off area around breaker outside woodshop ( 15" horizontally from center of box on each side, and 36" from front of box, 6'6" tall)
- repair the step at the back door
- install molding at bottom of stairs (it should be somewhere shoved in the corner of cosplay)
- mount mike wherling's American flag above the finishing room door
- sweep and swiffer stairs
- adhere rubber tiles to top and bottom of stairs
- empty all shopvacs (CNC, woodshop, laser)
- wash the trash can lids
- drain all the compressors in the building (laser, woodshop, metal shop)
- Carry down the 5-gallon kilz paint bucket
- vacuum all carpeted areas
- move ceramics stuff to Purcellville ceramics room!!
If there is something you'd like to add to this list, please let Jessee M know on slack!