Current Task List
- Finish removal of electrical cabinet on lower buildingbackside(Squirrl)
- Repair air compressor hose to mat cutter connection
- Create service area around picture framing equipment and material
- Make space for the equipment in Berryville that's slated to arrive in Purcellville around 10/16
- demo old studs in North wall
- reframe north wall with 2x6’s
- strip off old metal siding
- install new sheathing and Tyvek house wrap
- re-frame Bathroom
- re-frame West wall of multipurpose room
- remove East wall (front wall of building)
- frame new East wall with new windows and new door
- run 2x4’s on bottom of roof trusses to support new drywall ceiling
- move Electrical panel to new location,
- install new electrical boxes for lights, switches, and receptacles
- run wiring
- install drywall on ceiling
- to move woodworking tools into position in woodworking room
- make three workbenches for woodworking room
- install insulation in walls and ceiling
- hang drywall.
- finish drywall
- Paint new drywall
- Make workbench for Frame shop to include storage for sheets of glass
Replicate threaded leg for frame cutter extender
- Repair leaking roof (through ceiling heater) in Woodshop
Wish list (these are all pending budget approval, so this is truly a wish list at this time.
- I wish for some people to add their wishes for Purcellville here
- Get blacksmithing up and running (doesn't require power)
- Power to the mat cutter bay for testing (for picture framing)
- Mobile (standing height) work table for framing area
- Improve the last bay (southernmost) in the upper building?
- create forms for poured slab?
- enclose it to keep out the elements/critters?
- Enclose the bays in the structure in the SE corner of the property?
- Add car lift for routine vehicle maintenance?